Skip to Content

Preventive Maintenance Optimization for Automotive Manufacturing Plant

Client Type

Tier-1 Automotive Component Manufacturer

Challenge

Frequent unplanned downtime due to excessive wear and tear of critical machine components

Approach
  • Comprehensive preventive maintenance audit
  • Machine output monitoring
  • CAD modeling of critical components
  • 3D-printed prototypes for testing


Solution
  • Optimized maintenance schedules based on actual usage patterns
  • Redesigned components with improved durability
  • Rapid 3D-printed replacement parts for quick turnaround
Results
  • 32% reduction in unplanned downtime
  • Improved Overall Equipment Effectiveness (OEE)
  • Lowered maintenance costs
  • Faster spare-part availability